Check delivery and access before installing a golf simulator

A simulator carton can clear the door end-first and still get stuck on the turn. Ask for the packed dimensions before you order, then test the tightest corner on the route to the room.

Plan of an example basement route. A 48 inch carton passes the 29 inch door end-first but the mock-up catches at the corner of the 33 inch landing.
The mock-up clears the doorway end-first but catches when it turns on the landing.

Get the packed size and the longest rigid part

Ask the seller for the number, size and mass of cartons or pallets, the longest rigid part inside them, and any restrictions on which way each item can be carried. Ask where the driver will leave the delivery: at the roadside, at the first door or inside the simulator room. For a freestanding kit, ask how much room is needed around the frame while the installer lifts and joins parts.

  1. Start at the point where the carrier will unload. Measure the driveway or side gate, then every usable doorway between there and the bay. Measure the narrowest open gap past the door leaf, hinges and handles.
  2. At a stair or turn, measure the landing in both directions, the handrail projection and the lowest headroom. Mark the approach and destination on a sketch. Use an empty carton or a lightweight mock-up of the verified outside dimensions to check the turn with the delivery team.
  3. In the room, mark the working space for assembly, ladders and staging. Keep the door, escape route and utility access clear during assembly and after installation.

UK installer Golf Swing Systems asks customers to report restrictions such as stairs, narrow halls and low ceilings before delivery. Ask any UK or US supplier to put its own delivery scope and exceptions in writing. Golf Swing Systems installation terms.

UK two-carton example. GolfOnline’s SimBox V2 listing described two boxes. For the 3 × 2.5 × 1.5 m enclosure it listed 18 kg of poles and 6.7 kg of fabric. Those weights cover the contents. Ask for the packed dimensions, weight of each full box and length of the longest pole in your chosen kit. The GolfBays UK shipping threshold applies to the delivery charge. Confirm who will carry the boxes through the side gate to the garden room. GolfOnline’s weights · GolfBays SimBox listing

US pallet example. Carl’s Place’s original Pro kit specification lists 4–5 boxes totalling 130–150 lb without pipes. With pipes it specifies freight and requires someone to arrange unloading. Carl’s current shipping policy quotes applicable shipping charges at checkout and treats freight as an exception to its usual free service. Confirm the current kit packaging and ask the carrier whether liftgate service gets the pallet to ground level and where it will be left. Original Pro specification · Current freight policy

A 48 in carton at a basement turn

The Indoor Golf Shop lists the shipped SIG10 landing pad as 48 × 12 × 12 in (about 122 × 30 × 30 cm). This is one delivered component, with the enclosure and its longest pieces checked separately. SIG10 landing pad shipping dimensions.

The 12 in end fits straight through the example’s 29 in (74 cm) clear doorway. At a 33 in (84 cm) landing immediately beyond it, a low stair soffit restricts tilting. In this example, a cardboard mock-up catches on the frame on the attempted turn. The carton needs enough room to turn as well as enough width to go through the door.

Keep this order on hold until the supplier or delivery team confirms a route. In the example, an outside basement door gives a straight approach and its mock-up clears. If no route clears, ask about supplier-approved unpacking with the rigid pieces measured separately or choose a smaller compatible component.

Who prepares the room and tests the first shot?

  • Room works. Attach a drawing for the intended base or finished floor, mount backing, screen wall, protection and services. Identify which jobs and local checks belong to the building contractor or trades. For a garage conversion in England, see Planning Portal building regulations guidance. For US work, confirm scope with the local building office and include proposed electrical or mechanical changes.
  • Installation. Put access, delivery handoff, assembly, mounting, cable routing, alignment and calibration on separate quote lines. For electrical and data routes, give the installer the exact equipment positions and ask which work is included.
  • Handover. Ask the installer to check the screen and protection with you, point out the hitting zone, then show a shot from that position in your chosen app and on the display. Agree who supplies the licences and who will show you how to shut down and store the equipment. Use the software compatibility guide to confirm the host and app before the visit.

England garage conversion

Check with building control when converting a garage to a habitable room. Planning Portal lists wall and floor work, ventilation and electrical installations as items to review. Give the authority the current garage layout, intended use, insulation, openings and any new electrical work. Check planning permission separately, including any condition requiring parking to be retained. Planning Portal garage conversion guidance · Building Control Partnership garage conversion guide

US example for finishing a basement

Fairfax County, Virginia, lists a finished basement under its residential addition or alteration permit. Its permit guidance also lists interior renovations and new or relocated electrical fixtures. Check the equivalent building office for your own address. Describe whether you are putting equipment in a finished room or changing walls, circuits or the means of exit. Ask which building and trade permits cover those changes before scheduling the installer. Fairfax County permit category · Fairfax County permit triggers